The first park includes a ability of 200 MW whilst Sandrini II provides a capacity of one hundred MW. The overall expense of equally initiatives weren't disclosed having said that, in the course of building, over 200 personnel have been utilized. The jobs are expected to discover A few positions https://californiasolarcontractors.blogspot.com/2024/11/4-things-to-consider-before-hiring.html