The main park contains a ability of two hundred MW whilst Sandrini II has a potential of 100 MW. The full expense of each tasks were not disclosed nevertheless, during building, around 200 staff were used. The jobs are envisioned to discover A few positions opening up for permanent operations. https://solarcompaniesberkeley.blogspot.com/