Penmann has completed a significant HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system built to comply with demanding hygiene and production standards. The scope included the design, supply, installation and commissioning of advanced HVAC systems across civil, Medium Care (MC) and High Care (HC) https://www.penmann.co.uk/penmann-completes-precision-hvac-upgrade-for-nutricias-fsi-phases-1-2-in-liverpool/